The Thames Barrier

A very prestigious and demanding application for Chockfast was on the Thames Flood Barrier at Woolwich. Welding distortion of the gates prevented achievement of the designed for steel to steel fit on both the fixed and hinged connections to the gate arms. After extensive testing Rendall Palmer & Triton the engineering company responsible for the design and construction of the Barrier selected Chockfast Orange to fill the gaps between the mating steel surfaces.

The fixed ends were filled first and the gaps ranged between 2mm in the centre to 35mm at each end. The minimum 2mm gap was determined by fitting 2mm thick stainless steel shims on the top face of the gate arms prior to landing the gates. The centre shims were trapped and supported the gate arm. These were left in place and encapsulated in Chockfast when the gap was filled by pouring through selected boltholes. The shims not trapped by the gates were removed before pouring commenced.

The next phase was to grout the underside of the hinges which were set level on jack screws. The gate arms were not in place at this stage. The Chockfast was allowed to cure and then the bolts tightened.

Because of thermal growth and contraction of the gates the hinges had special sprung loaded steel pads fitted between the top of the hinges and the underside of the gates to allow the gates to slide over them. The main support was provided by temporary jacks with low friction surfaces.

The special pads were then filled with Chockfast Orange and when the resin had cured the bolts were fitted and tightened. The hinges were then able to rotate and absorb the movement of the gate. The area remaining around the pads was then filled with Chockfast Orange by again pouring through bolt holes from inside the gate.

The work had to be carried out quickly during neap tides as these areas were submerged at high tide!

Another area where Chockfast overcame a serious problem was the support of the sub frames carrying the huge hydraulic rams and crossheads that operate the gates. Initially these sub frames were to have been shimmed on to the finished concrete foundation. However, the concrete was poured over datum height and had to be reduced in height with pneumatic chisels which left a surface impossible to shim. The sub frames had to be set level to very tight tolerances using Taylor Hobson instruments. Circular pads of Chockfast Grey were poured to provide level surfaces on which to stand the levelling jacks. Once level the frames were grouted by forming discreet pads of Chockfast Grey mixed with aggregate around each of the foundation bolts to make up the bulk of the pour thickness. A gap of approximately 10mm was left for a final pour with Chockfast Orange. The sub frame foundation bolts were then tightened after the Chockfast had cured.

Where fitters had failed to achieve level tolerances after weeks of shimming one frame, each sub frame was chocked in three days using Chockfast!

The design specification demanded the clamping bolts must not lose anymore than 5% of their pre stress over 50 years. Selected bolts are monitored and as far as we know tension has been maintained for the past 33 years.

The Thames Barrier

Share this project

Recent Projects

What our clients say

FMPG have used IMS (previously UK Marine Resins) for over 30 years and have always had excellent service, they are prompt and reliable. Whilst onsite they can be trusted to work in a safe and efficient manner with little or no supervision. As a company to do business with, they are our first choice in this field of work
Bernie Paul
Production Manager - Ferguson Marine (Port Glasgow) Ltd
We've been working with UK Marine Resins for several years now, and I can confidently say that their service and product quality are second to none. The Chockfast product range they supply consistently meets our expectations in terms of performance, reliability, and durability. Whether it's for engine foundations or critical alignment applications, Chockfast products has proven to be the gold standard in epoxy chocking solutions.

What truly sets UK Marine Resins apart is the extensive knowledge and hands-on experience of their team. Their technical staff are extremely well-versed in both the technical and practical aspects of marine resin systems. From the initial consultation to on-site support, their guidance is always expert and to the point. They understand the challenges of the marine sector and consistently deliver tailored solutions that work in practice.

UK Marine Resins has become a trusted partner for us, and we look forward to continuing this strong collaboration for many years to come.
Marco van 't Geloof
General Manager of DMG
We have worked with UK resins for many years now. They supply an excellent service to us, sometimes at short notice. They have carried a range of different applications for us on ships from stern tube sealing to engine and winch seats. All the teams that have attended our site have a great knowledge of the products and always see the job through, we’ve had a few late nights over the years. Anytime we have any issues with a customer who is unsure of what they need, Ron and team are at the end of the phone helping us find a solution. 
John Williams
A&P Falmouth

Some of our clients

Need a quotation? Please submit an enquiry below

GDPR*